CNOOC
Limited
|
|
(Translation
of registrant’s name into English)
|
|
65th
Floor
Bank
of China Tower
One
Garden Road
Central,
Hong Kong
|
|
(Address
of principal executive offices)
|
Form
20-F X Form 40-F
___
|
Yes
___ No X
|
CNOOC
Limited
|
|||
By:
|
/s/
Kang Xin
|
||
Name:
|
Kang
Xin
|
||
Title:
|
Company
Secretary
|
||
Dated:
January 28, 2008
|
Exhibit
No.
|
Description
|
||
99.1
|
Press
release dated January 28, 2008, entitled “CNOOC Ltd. Ink A Deal
with Talisman on Tangguh LNG
Project”.
|
Location
|
Bintuni
Bay,
Papua
|
Production
sharing
contracts
|
Berau,
Wiriagar and
Muturi
|
Date
discovered
|
1994
|
Water
depth of the
platform
|
Up
to 60
meters
|
Proven reserves
|
14.4
tcf
gas
|
Development
components
|
Two
wellhead platforms offshore
exporting unprocessed gas via 24 inch diameter pipelines running
22 km
to LNG plant
onshore
|
Development
consent
|
March
2005
|
First
LNG
|
Late
2008
|
Max.
design capacity for LNG plant
(two trains)
|
7.6
mmtpa
|
Partners
|
BP
Berau
Ltd 37.16%
MI
Berau
B.V 16.30%
CNOOC
Ltd. 13.90%
Nippon
Oil Exploration (Berau),
Ltd 12.23%
KG
Berau/KG Wiriagar
10.00%
LNG
Japan
Corporation 7.35%
Talisman
3.06%
|
Estimated
development
cost
|
$US
5
billion
|
Lead
contractor
|
PT
Saipem
Indonesia
|
Platforms
|
Two,
6 legged, normally unattended
wellhead platforms controlled from
shore
|
Well
slots
|
16
per
platform
|
Weight
|
Deck
: Approx. 1800 MT, Jacket :
2100 MT
|
Dimensions
(height and width at
base)
|
Jackets:
approx. 67m
(h) x 20mx30m
(w).
Decks
: Approx. 30m
x 35 m
(w)
|
Where
built
|
PT
Guna Nusa fabrication yard,
Cilegon
|
Date
installed
|
1Q
2007
|
Pipelines
|
Two,
24 inch pipelines, running
22 km
to shore. To be installed in
4Q-2006
|
EPC contractor
|
Consortium
KJP (Kellogg Brown
&Root, JGC and PT Pertafenikki)
|
Processing
equipment
|
Two
train 3.8 mmtpa
capacity each
to
liquefy gas into LNG
|
LNG
storage
tanks
|
Two
insulated tanks capable of
storing 170,000
m3
each
|
Export
|
LNG
export jetty designed for
140,000 ton LNG carriers
|